Communities, utilities, and lenders are asking the same question: can you prove it?
of data center projects blocked or delayed by local opposition in the first half of 2026.
Data Center Watch, via Statistastate data center bills in the first six weeks of 2026, most moving toward water disclosure and permitting rules.
Capacity, August 2026of new debt secured on GPUs in 2026 through October 10, across 21 public financings.
American Compute GPU Financing TrackerOne record of the site. Three reports for three decisions.
Each report states its method, its assumptions, and how complete the data was.
Water, energy and carbon record
An hour-by-hour account of what a site consumed, with evaporative, closed-loop, and air-cooled designs compared on the same workload.
- Decision it supports
- Permits, council hearings, and state water disclosures.
- What is in the report
-
- Electricity used, hour by hour, from GPU-level readings
- Water use, calculated with the federal cooling tower formula
- Carbon dioxide from grid electricity, at the EPA rate for the region
- Every assumption listed, so a reviewer can challenge it
Independent verification report
When a site is asked to cut its load, this report states whether it did, by how much, and how certain the answer is.
- Decision it supports
- Whether a curtailment commitment was honored.
- What is in the report
-
- A verdict: met, met within baseline variability, or not met
- Baseline and actual power, with a chart of the event
- A range for the result, so normal swings are not mistaken for a reduction
- A data check that withholds the number when readings are missing
GPU asset record
For each GPU: time spent at high temperature and the number of thermal cycles. It records what happened and makes no prediction about remaining life.
- Decision it supports
- The condition of hardware that secures a loan.
- What is in the report
-
- Hours at or above a set temperature, per GPU
- Thermal cycles: full swings from cool to hot
- Energy delivered through each GPU
- The fleet ranked by how hard each GPU was run
From raw readings to a record someone else can check.
Collect, read-only
A small collector reads GPU power and temperature on your machines. It queries values and sends no commands.
Add public context
Readings are combined with open data for the site: weather observations, grid prices, and the grid's emissions rate.
Report, with the working shown
Every figure traces back to a reading or a stated assumption. Where a number is calculated and not metered, the report says so.
Independent measurement, not a vendor's own scorecard.
A company that sells savings cannot audit its own results. BramiqAI sells the measurement and holds no stake in the outcome.
Ask us how| Topic | Optimization software | BramiqAI |
|---|---|---|
| What it sells | Savings or flexibility | The measurement |
| Access to equipment | Changes settings | Read-only |
| Whose results it reports | Its own | The site's, whatever software it runs |
| Who reads the output | The operations team | Regulators, utilities, and lenders |
Real measurements and recognized methods.
Our demonstrations run on public research data from working supercomputers, so you can check our reports against the source.
I trained as an environmental scientist. I want the evidence before the claim.
I worked on liquid cooling products at Intel and ZutaCore, and I saw how often a data center's water and energy figures were estimates passed along as facts. The people deciding on permits, grid connections, and loans deserve a record they can check.
BramiqAI is early. The three reports work today, and the next step is real sites. If you build, connect, or finance data centers, I would like to show you what we have and hear what you need.
See the three reports on real data.
A 20-minute walkthrough of the working product, then your questions.